No. 94-1617.United States Court of Appeals, First Circuit.Heard October 5, 1994.
Decided January 11, 1995.
Page 41
Stanley W. Wheatley with whom Gordon Wise, Boston, MA, was on brief, for appellant.
Walter J. Connelly with whom Lyne, Woodworth Evarts, Boston, MA, was on brief, for appellee.
Appeal from the United States District Court for the District of Massachusetts.
Before CYR and STAHL, Circuit Judges, and DiCLERICO, District Judge.[*]
STAHL, Circuit Judge.
[1] Industrial General Corporation’s (“IGC”) subsidiary, Plastek Corporation (“Plastek”), supplied molded plastic parts to Moog Electronics (“Moog”) for use in electronic voting machines Moog was assembling for Sequoia Pacific Systems Corporation (“Sequoia”). After Moog failed to pay Plastek $80,100 for supplied parts, Plastek sued Sequoia alleging breach of contract and violation of Mass. Gen.L. ch. 93A, § 11. Following a seven-day trial, the jury returned a verdict for Sequoia on the breach of contract claim. In an advisory verdict on the 93A claim, it found that Sequoia had acted “unfairly.” The district court eventually agreed with the advisory finding and further held that Sequoia had breached a fiduciary duty it owed to Plastek and entered judgment for Plastek on the 93A claim. Because we find that no fiduciary relationship existed between Plastek and Sequoia, we reverse the court’s chapter 93A judgment.[1] I. [2] FACTUAL BACKGROUND AND PRIOR PROCEEDINGS
[3] In 1984, Sequoia began to design and develop computerized electronic voting machines which it hoped to sell to local election boards. During that same year, Sequoia Associates, a partnership and one of Sequoia’s stockholders, had explored the possibility of acquiring IGC’s predecessor-in-interest, Walco National, Inc. (“Walco”). Though the Sequoia Associates-Walco deal ultimately failed, because of the acquisition negotiations, Sequoia Associates had become familiar with Walco’s Plastek division, which produced molded plastic parts. Recognizing that the voting machines would use plastic parts, Sequoia Associates advised Sequoia of Plastek’s molding abilities. The introduction was fortuitous, as Sequoia was under time constraints to complete the project and had been unable to locate a suitable supplier for the needed plastic parts.
Page 42
[4] Commencing in mid-1985, Sequoia and Plastek entered into a series of contracts providing that Plastek would develop proto-type molds and, later, produce prototype parts for use in the voting machines project. Meanwhile, Sequoia and Moog entered into agreements for Moog to assemble a number of prototype voting machines. In connection with these agreements, Sequoia instructed Plastek to ship some prototype parts to Moog. Sequoia paid Plastek in full for the prototype molds and prototype parts and these transactions are not in dispute. Later, Plastek produced production molds, for which Sequoia also paid in full. [5] In the latter part of 1985, Sequoia decided to contract with a manufacturer to assemble the Sequoia-designed voting machines. Sequoia would then purchase the machines on a “turn-key” basis,[2] thus relieving it of both the burden of carrying the inventory of parts required for assembly and the burden of assembly itself. Sequoia awarded the initial manufacturing contract to Momentum Technologies, Inc. (“Momentum”). Moog sued Sequoia, claiming that one of their earlier prototype-assembly contracts contained a promise to award Moog a contract for an actual production run of at least 5,000 machines. In settlement, Sequoia agreed to award Moog a contract to manufacture 500 machines with Momentum manufacturing the balance of Sequoia’s requirements. [6] Moog’s finances during this period were shaky, though the extent of Sequoia’s knowledge of Moog’s condition was disputed at trial. The district court credited the testimony of Edmund Lonergan, Sequoia’s former technical director, who at trial testified by deposition that he developed a “gut feeling” that Moog was not “financially strong enough to manufacture all the units per our [settlement] agreement with them.” Lonergan alerted his superiors at Sequoia. James Larkin, Sequoia’s chief financial officer, testified that he knew Moog had a cash-flow problem and that he agreed to a billing arrangement designed to improve Moog’s cash situation. [7] Sequoia informed Plastek that the machines would be assembled by contractors and that Plastek’s agreement for production parts were to be made directly with those assemblers. Complying with this directive, both Moog and Momentum contracted directly with Plastek and other suppliers for the voting machine parts. [8] In June and July 1986, Moog issued to Plastek purchase orders for production parts.[3] Plastek sent acknowledgement of the orders to Moog. Plastek manufactured the parts and shipped them to Moog on a net 30 day basis. Plastek invoiced Moog directly and the invoices stated, “Sold to Moog.” The shipments were carried on Plastek’s books as Moog account receivables. Plastek never conducted a credit check on Moog, nor did any Plastek official inquire of Sequoia about Moog’s financial situation or creditworthiness. [9] After the Moog-Sequoia settlement was in place, things began to deteriorate at Moog. Moog quickly fell behind on its production schedule. Eventually, Sequoia determined that Moog would be unable to timely perform its contract and, in September 1986, requested Moog to transfer all work-in-progress to Momentum. Sequoia paid Moog in full for its work-in-progress, including the amount Moog owed Plastek for the production parts. [10] Moog, however, never paid Plastek. Plastek sought to collect its unpaid balance from Moog with no success. In November 1986, well after the work-in-progress transfer had taken place, Plastek alerted Sequoia of its problems with Moog. By early 1987, Moog was insolvent. In February 1987, Plastek notified Sequoia that it was holding Sequoia responsible for the unpaid Moog balance. Five months had passed since Plastek had shipped and invoiced its parts to Moog. [11] In 1989, Plastek, through its parent, IGC, brought the present action in Massachusetts Superior Court seeking recovery for breach of contract and for violation of Mass.Gen.L. ch. 93A, § 11. Sequoia removed the case toPage 43
federal district court with jurisdiction grounded in diversity of citizenship. After discovery, the district court denied Sequoia’s motion for summary judgment. The district court held a seven-day jury trial in February 1994. The district court instructed the jury to answer questions on a special verdict.
[12] The jury returned a verdict in Sequoia’s favor on the breach of contract claim. With regard to the chapter 93A claim, the jury found that Sequoia acted “unfairly” in “failing to disclose what it knew about Moog’s financial stability.” However, the jury did not find that Sequoia’s acts were deceptive or that its actions were knowing and willful. The district court, essentially agreeing with the jury, found that Plastek was in a position of “trust and dependence” relative to Sequoia and that Sequoia had acted “unfairly in failing to disclose the fact that Moog was an unreliable customer.” Industrial Gen. Corp. v. Sequoia Pac. Sys. Corp., 849 F. Supp. 820, 824 (D.Mass. 1994). The district court entered judgment in favor of IGC for $80,100.69 plus costs. This appeal followed.II. [13] DISCUSSION
[14] Sequoia argues that the district court committed clear error in three respects: by finding (1) that Sequoia and Plastek had a fiduciary or quasi-fiduciary relationship; (2) that Sequoia possessed knowledge of material facts that it did not disclose to Plastek; and (3) that Sequoia’s failure to disclose material facts regarding Moog’s financial condition was causally related to Plastek’s damages. After reciting the standard of review, we take up Sequoia’s first argument. Because we conclude that no fiduciary relationship existed between these parties, we do not reach the other claims of error raised by Sequoia.
Page 44
of what may qualify for consideration as a chapter 93A violation is a question of law.'” Shepard’s Pharmacy, Inc. v. Stop Shop Cos., 37 Mass. App. Ct. 516, 640 N.E.2d 1112, 1115
(1994) (citation omitted). Here, the unfair conduct complained of is Sequoia’s failure to disclose Moog’s precarious financial condition. A commentator has noted that section 11 “probably does not contain a general duty of disclosure” and where the statute does give rise to such a duty, it “should be limited to situations which even at common law sometimes required disclosure,” including instances where the defendant is a fiduciary. Michael C. Gilleran, The Law of Chapter 93A § 4:10 (1989 Supp. 1994). The theory presented to the jury and later adopted by the district court was that Sequoia stood in fiduciary relationship to Plastek and, consequently, a duty to disclose arose. We agree with the district court that if a fiduciary relationship existed, its breach would have constituted a chapter 93A violation.
Page 45
[26] We think the district court’s conclusion is mistaken for two basic reasons. First, it rests on a subsidiary factual finding that we believe is clearly in error. Upon careful review of the record, we think the court’s assertion that “Sequoia generated the purchasing orders and effectively authored the contract between Plastek and Moog,” id., substantially misstates what transpired. To be sure, Sequoia officials directed Plastek to deal directly with Moog. However, as both Sequoia and Plastek officials testified, Moog issued purchase orders for the production parts and Plastek acknowledged those orders.[4]Page 46
that Plastek was “naive, inattentive and altogether too trusting of Sequoia,” Industrial Gen. Corp., 849 F. Supp. at 825-26, and that its complacency may have been due, in part, to the fact that Plastek and Sequoia “were not strangers to one another” given the initial exploration by one of Sequoia’s principals into acquiring Walco (the predecessor-in-interest of Plastek’s parent company). By extending credit to Moog and assuming — perhaps through naivete, inattention and trust — that Sequoia would pick up the tab, Plastek clearly made a costly mistake. Though Sequoia might have chosen to share with Plastek its concerns about Moog’s finances as they developed, we do not think that its failure to do so would make Sequoia a commercial rascal.
[30] Under the clearly erroneous standard, we are not free to reverse merely because we disagree with the district court’s conclusions. Rather, we must have the strong, unyielding conviction that the district court was mistaken. This standard is especially important in a case like this where the district court made a factual determination based on evidence adduced during a lengthy and exhaustive trial. We emphasize that we have thoroughly and carefully examined the record. Based on the record as a whole, and in light of similar factual evaluations made by Massachusetts courts, we are of the unyielding belief that the district court’s conclusion that a fiduciary relationship existed between Sequoia and Plastek was mistaken. Because there was no fiduciary relationship, no duty to disclose existed and thus no cause of action lies under section 11, chapter 93A. III. [31] CONCLUSION
[32] For the foregoing reasons, the decision of the district court is reversed and the case is remanded for proceedings consistent with this opinion.
OLGA PAULE PERRIER-BILBO, Plaintiff, Appellant, v. UNITED STATES; L. FRANCIS CISSNA, Director, U.S. Citizenship and…
United States Court of Appeals For the First Circuit ?No. 17-1803 ANA MARINA PEREZ-RABANALES, Petitioner,…
United States Court of Appeals For the First Circuit No. 16-2401 LORI FRANCHINA, Plaintiff, Appellee,…
United States Court of Appeals?For the First Circuit No. 16-2222 UNITED STATES OF AMERICA, Appellee,…
860 F.3d 752 (2017) UNITED STATES of America, Appellee, v. Hector Luis TORRES-FIGUEROA, Defendant, Appellant.…
860 F.3d 39 (2017) UNITED STATES of America, Appellant, v. Wayne CARTER, Defendant, Appellee. United…